Breadcrumb Navigation

South Davis

South Davis Elementary
2001 South Davis Dr. Arlington, TX 76013

Project Status

UPDATE: The Bond 2019 project at South Davis Elementary is in phase two of the five-year bond program, and construction started last summer. There is some painting in the hallways and fencing being done now, but most remaining work will be done this summer.

Much of the building, inside and out, is being repainted, and carpet and mini blinds throughout the building are being replaced. The kitchen’s walk-in cooler and freezer is being replaced as well. Ceiling tile will be replaced in the library, in the corridor adjacent to the cafeteria and in six classrooms. The stage is being improved, too, with new lighting and new tan curtains. Plus, the stage’s original wood floor was sanded and refinished.

The project is expected to wrap up in August.

New playgrounds for South Davis are now open.

Project Scope

  • Heating, A/C and Electrical Improvements
  • Interior Renovations (Paint, flooring, etc.)
  • ADA Accessibility Improvements (Door hardware, ramps, restrooms, etc.)
  • Site Improvements (Landscaping, irrigation, signage, etc.)

This list is not comprehensive and is subject to change.

  • Full-day Pre-K Renovations Specific to Campus Needs
  • Playground Replacements and Renovations (Surface, equipment, canopy, ADA accessible)
  • Instruments

This list is not comprehensive and is subject to change.

  • Expanded Security Camera Coverage and Upgraded Camera Software
  • Safety & Security Enhancements (Exterior and interior key system upgrades, district communication system upgrades, lighting, fencing, etc.)
  • Device Upgrades and Expanded Access

This list is not comprehensive and is subject to change.

Project Details

PHASE
Phase 2

CONSTRUCTION
Start: Summer 2023Ìý Ìý Ìý Finish: Fall 2024

ARCHITECT
WRA Architects

CONSTRUCTION MANAGER
MDI General Contractors

PHASE
Phase 3

CONSTRUCTION
Start: Fall 2023Ìý Ìý ÌýFinish: Early 2024

·¡±·³Ò±õ±··¡·¡¸éÌý
Glenn Engineering

GENERAL CONTRACTORÌý
J Squared (concrete/earthwork)
Lea Park & Play (playground equipment and install)

Ìý

Contact Us

Bond 2019 logo
AISD Bond 2019 logo

Bond 2019

$966 MILLION

• Facilities
• Fine Arts
• Safety, Security & Technology
• Transportation

Fine Arts icon
Fine Arts icon

Fine Arts

The fine arts portion includes: theater equipment and black boxes, instruments, visual arts equipment and work surfaces, piano replacements and uniforms for marching bands, drill teams and choirs.

Icon for safety, security and technology
Icon for the Bond 2019's Safety, Security & Technology

Safety, Security & Tech

The safety, security and technology portion includes: additional security cameras and upgraded alarm systems, districtwide communications system upgrade, network infrastructure, device replacements and strategic 1:1 (student devices).

Transportation icon
Transportation icon

Transportation

The transportation portion of the bond includes new buses, shuttle buses, service vehicles. Also included are new vehicles and trailers for the Dan Dipert Career + Technical Center, the Agricultural Science Center, high school bands and security.

Facilities icon
Facilities icon

Facilities

The facilities portion includes: new construction, condition needs and life cycle improvements for all schools, new playgrounds at all elementary schools and facility upgrades for fine arts and athletics.