Duff Elementary

Duff Elementary
3100 Lynnwood Dr. Arlington, TX 76013

Project Status

  • Playground Construction
    0%

UPDATE: The Bond 2019 project at Duff Elementary is in phase two of the five-year bond program.

Construction started last summer. The old metal gym was demolished last July to make way for a new gym. Construction is getting close to being done and the new gym should open in November.

There was a lot of work done inside the existing building, too, during the summer, from restroom renovations to new ceilings in all the corridors and the cafeteria. Plus, a new sprinkler system was installed throughout the school and some new light fixtures were installed in some classrooms.

The new library is coming along, too, and will open by the end of August. The old library was demolished along with an adjacent classroom which is being absorbed into what is a bigger, better library.

Read more about all of the projects planned for Duff. demolition photos.

The new playgrounds for Duff were in phase one and are complete. .

Project Scope

  • Kitchen Renovations
  • Heating & A/C, Electrical, Plumbing Improvements
  • Interior Renovations (Paint, flooring, ceilings, lighting, etc.)
  • ADA Accessibility Improvements (Door hardware, ramps, restrooms, etc.)
  • Restroom renovations
  • Site Improvements (Lighting, landscaping, drainage, irrigation, signage, etc.)
  • Paving Improvements
  • Exterior Window Renovations

This list is not comprehensive and is subject to change.

  • Gymnasium Replacement
  • Playground Replacements and Renovations (Surface, equipment, canopy, ADA accessible)
  • Instruments

This list is not comprehensive and is subject to change.

  • Expanded Security Camera Coverage and Upgraded Camera Software
  • Safety & Security Enhancements (Exterior and interior key system upgrades, district communication system upgrades, lighting, fencing, etc.)
  • Device Upgrades and Expanded Access

This list is not comprehensive and is subject to change.

Project Details

PHASE
Phase 2

CONSTRUCTION
Start: Summer 2023      Finish: Fall 2024

ARCHITECT
WRA Architects

CONSTRUCTION MANAGER
MDI General Contractors

PHASE
Phase 1

CONSTRUCTION
Start: Spring 2021     Finish: Summer 2021

·¡±·³Ò±õ±··¡·¡¸éÌý
Glenn Engineering

CONSTRUCTION
Reeder Concrete Inc. (concrete flatwork) 
Miracle Recreation Equipment (playground equipment and install)

Contact Us

Bond 2019 logo
AISD Bond 2019 logo

Bond 2019

$966 MILLION

• Facilities
• Fine Arts
• Safety, Security & Technology
• Transportation

Fine Arts icon
Fine Arts icon

Fine Arts

The fine arts portion includes: theater equipment and black boxes, instruments, visual arts equipment and work surfaces, piano replacements and uniforms for marching bands, drill teams and choirs.

Icon for safety, security and technology
Icon for the Bond 2019's Safety, Security & Technology

Safety, Security & Tech

The safety, security and technology portion includes: additional security cameras and upgraded alarm systems, districtwide communications system upgrade, network infrastructure, device replacements and strategic 1:1 (student devices).

Transportation icon
Transportation icon

Transportation

The transportation portion of the bond includes new buses, shuttle buses, service vehicles. Also included are new vehicles and trailers for the Dan Dipert Career + Technical Center, the Agricultural Science Center, high school bands and security.

Facilities icon
Facilities icon

Facilities

The facilities portion includes: new construction, condition needs and life cycle improvements for all schools, new playgrounds at all elementary schools and facility upgrades for fine arts and athletics.