LIFECYCLE/DEFICIENCY WORK
Phase: Three
Architect: Corgan
Construction Manager: Big Sky  Construction
Start Construction:Â Winter 2018
Finish: ¹ó²¹±ô±ôÌý2018*
*Dates are projections and subject to change.
TRACK CONSTRUCTION
Phase: Three
Architect: Stantec
Construction Manager: Hellas Construction
Start Construction:Â Spring 2018
Finish: Fall 2018*
*Dates are projections and subject to change.
Project Status: Substantially Complete
Work at Gunn has wrapped up. Concrete edging for new landscaping in front of the building was installed last spring break. A new ramp to the stage is complete. Electrical work -Â installing new circuits and wiring for the addition of new battery backup emergency fixtures throughout the building - is done. The parking lots and drive have been demolished and redone. Renovations in the science labs are done, and new RTUs have been installed. Gunn also received a new fire alarm system. In addition, several collaboration areas were created within the building by removing old locker banks and installing new white boards.
Construction of the new four-lane track started in March and is substantially complete.
Project Scope
- Upgrade technology connectivity (new fiber)
- Improve existing site accessibility
- Add additional card access controls
- Replace and add parking
- Replace sections of roof
- Repair/replace and upgrade heating and A/C, electrical, electrical equipment, plumbing, fire alarms and landscaping
- Add new 4-lane track (separate project)
This report includes highlights of projects. The list is not comprehensive and is subject to modification.